Some more info. Upon further review I was able to find a way to make a direct reference of the assembly to the operation. I am wondering if this is the key to drive the requirement for the quote and invoice? Have quote and RRB look to see if assembly field is populated on the operation level.
If it is populated then group together as one line/cost item. If assembly is left blank then display each operation/line item separately.
