Hi Sir, need clarification on this, correct landed cost should be 86,221.30 but the total landed cost entered was 88,478.99. We adjusted it doing your instuction but we changed the fixed cost amount and what was cancelled/reversed is the correct amount 86,221.30 instead of 2,257.97. How can we correct this Sir? Thank you so much.
↧