Hi Sir, need clarification on this, correct landed cost should be 86,221.30 but the total landed cost entered was 88,478.99. We adjusted the amount by changing the fixed cost and what was cancelled/reversed is the correct amount 86,221.30 instead of 2,257.97. How can we correct this Sir? Thank you so much.
↧