Processing of Changed Purchase Order Items - Revision Level

$
0
0

Hello,

 

We have recently implemented SNC and have turned on the enhancement switch SCM_SNC_GEN_1.  This enhancement switch allows us to also bring over the Revision Level in the purchase order from ECC into the SNC system.   When the revision level is changed it does not trigger a change status. 

 

I found the following link that states the following:

 

The system regards an item as changed in the following instances only:

  • The following data has changed:
    • Goods recipient
    • Customer location
    • Ship-to location
    • Product
    • Requested quantity
    • Requested delivery date
    • Incoterm
    • Price
    • Manufacturer part number
    • Manufacturer
  • The customer has canceled or blocked the item.
  • The customer has added a new component to a subcontract order.

Only these changes can affect the change status or cause alerts to be generated.

 

http://help.sap.com/saphelp_scm70/helpdata/en/47/ccbc4efb1e3c83e10000000a42189c/frameset.htm

 

Does anyone know if there is a way to get other changes to trigger the "Change Status"?

 

Thanks,

Heidi