Dear Experts.
Please, help me with the storage location of the components defined in the production order.
1. I have two plants:
• plant01 – which has workcenter 01
• plant02 – where needs to create PP-order
2. Workcenter 01 has a production supply area for plant plant01 with storage location StLoc0101.
3. Routing for plant02 has operation which contains workcenter 01 of plant plant01. The component is assigned to this operation.
4. Storage location data (MARD) is maintained for this storage location StLoc0101 for this component for plant01.
5. Storage location data (MARD) is maintained for storage location StLoc0202 for this component for plant02.
According to SAP Note 1808922 question 1: If the operation to which the component is assigned in the production order contains a work center with a production supply area (PSA), the system transfers the storage location from this production supply area (PVBE-LGORT).
Thus when I create PP-order for plant02 the system must transfers the storage location StLoc01 plant01, but when I create PP-order for plant02, the system transfers the production storage location (StLoc0202 plant02) of the material to be withdrawn (MARC-LGPRO) from the MRP data in the material master for plant02. When I change component of PP-order the system allow to change plant from plant02 to plant01 and storage location from StLoc0202 to StLoc0101.
In what the reason?