Hello Tania,
I did the modifications as u had told. I have also changed AMT/26 to AMT/ VAR9 (as AMT/26 is hardcode and total working days is always unstable and cant be 26 days every month)
But when I run the PY, am being hit by an error in the log. Plz check below
I hope I have modified the PCR per ur suggestions. I have copied ZAT6 to ZAT7 and have done the modifications in ZAT7 and have inserted the same in schema in place of ZAT6.
Help PLz
Harriss

