Similar boat, was surprised to see that there is no IC payable/receivable posted via ABT1N. So the only way to close the loop on this one is to manually post the IC payable and receivable entry?
↧
Similar boat, was surprised to see that there is no IC payable/receivable posted via ABT1N. So the only way to close the loop on this one is to manually post the IC payable and receivable entry?